I think we have established routes 129 SL4 and Silvertown Tunnel Cycle Bus (numbered SCS) use the new tunnel, with buses per hour at 7.5 + 7.5 + 5 respectively.
Buses per hour through Blackwall Tunnel: 5 bph
Buses per hour through Silvertown Tunnel: 20 bph
Total change in bus requirement: +36
I think we also have it established the above routes, and 108, will all be free to use for a year. To compensate for the high tolls on Blackwall Tunnel and Silvertown Tunnel.
I have uploaded this on 1st April hopefully but the tunnel opens next week on the 7th.
Postscript: Completely forgot until now (14/5/25), whoops.
Blah blah, what is my opinion and how I will achieve it and why am I so good?